Projects

Tolko – High Prairie, Alberta, Canada

Press Replacement Project

Aug. 2022 to Dec. 2024

Project Details

CMA has provided all the detailed design and engineering for all disciplines (mechanical, civil, structural, electrical & architectural) as well as structural and equipment detail fabrication drawings pertaining to the following mill upgrades at Tolko’s High Prairie OSB mill:

  • Conversion of two (2) 8’ wide ponds to one 16’ nominal log pond as well as a new pond outfeed system.
  • Pond mud handling system.
  • Log reject system.
  • Dry strand conveyor, storage and weighing systems.
  • Resin storage, resin metering and strand blending systems.
  • Forming station system.
  • Material reject system.
  • Continuous press system.
  • Finishing line and packaging line systems.
  • Dust collection system.
  • Thermal oil system.
  • Warehouse extension and all buildings required to house the aforementioned process upgrades.

CMA also provided the budget/schedule preparation, on-site construction management and start-up assistance for the project.